Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpforms-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Design of the Sustainable Energy Plan for Cascais Municipality - S317 Consulting

S317 Consulting

Design of the Sustainable Energy Plan for Cascais Municipality

Portugal | 2018

    Support the Cascais Municipality in the sustainable energy action plan to address the 2030 challenges.
    This plan is key for Cascais to achieve the carbon neutrality by 2050.